Furring A Concrete Wall
Step 1 preparation.
Furring a concrete wall. Masons will often mention furring to describe the actual process of installing strips or hat channels to a surface. Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out. With a pencil or a marker draw vertically lines from. Mark the wall for vertical furring strips installed 16 inch on center.
We installed our side pieces first then the top and bottom pieces. Step 4 attach. Always continually check for level as you go. Position the lines 3 inches from the wall at the top and bottom at the center point of the wall and in between the 3 inch lines and centerline.
Furring is the process of raising or leveling surfaces of a wall or ceiling to make it even. Now repeat this process at the top of the wall. Step 2 mark your wall for furring strip locations. In concrete wall applications furring channel is installed vertically to the wall surface using concrete nails or power driven fasteners.
This is a very necessary procedure in the construction process as it is a requirement to make a building structurally sound. Determine the desired position of the furring strips or 2x4s before drilling any holes. Measure your concrete wall to determine the number of furring strips or studs you ll need. How to install a furring strip to cement wall.
Next fill in with your vertical furring strips again we placed one every foot 12 inches. Make exact measurements ensure. Using the level plumb down the wall and draw a line for reference. These markings will indicate where you will vertically attach your.
If you are finishing a basement then chances. Pre drill the holes in the furring strips so they do not crack when. Tapcon concrete screw installation. Clarkdietrich furring channel is a hat shaped corrosion resistant framing component used to furr out masonry walls and ceiling assemblies.
Use your ram set to install furring strips to the concrete wall. Using a hammer drill and 3 16 inch masonry bit put up horizontal 1x3 spruce boards by drilling 5 inch deep pilot holes through the wood foam and concrete. Clear the holes of all. Determine not only the number.
Using a hammer drill drill holes using the correct diameter carbide tipped masonry bit for the concrete screw diameter. Gypsum panels are then screw attached to the furring channels.