Drip Edge Fascia Roof
How far should a drip edge be from fascia.
Drip edge fascia roof. To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first. Galvanized cleat formed fascia cover and hidden 4 in. Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto. I ve seen drip edges on some homes that do not match fascia and it does look bad.
The system consists of a formed 20 ga. It can be done. If the gutter is lower than the bottom edge of the drip edge install flashing behind. A drip edge that matches the roof will be less likely to show dirt staining from asphalt shingles right.
The lower edge of a roof should extend beyond the fascia board by about 3 4 inch so that runoff drains into the gutters. Use a flat pry bar and hammer to pry the nails out of the drip edge gently. Once free slide the drip edge out and discard. While the vertical leg should be placed 1 4 1 2 away from the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing. If you run into issues with the overlap and need to resolve the gap review the following tips. If the overlap is too short fix it by placing drip edge under the first row of roof shingles and be sure that the.